Cushion Coat
Comfort & Performance Combined
The Cushion Coat is a specialized layer applied over the Acrylic Resurfacer to enhance the comfort, safety, and playability of sports courts. Made from high-quality acrylic polymers mixed with fine rubber granules, Cushion Coat provides a resilient, shock-absorbing surface that reduces player fatigue and minimizes the risk of injuries.
Capacity – 50 KG
Mixing Ratio
Cushion – 50KG
Water – 40KG
Why Choose Power Court Concrete Primer
Superior Adhesion
With over a decade of experience, Power Court has mastered the art of creating world-class sports flooring solutions that meet international standards.
Enhanced Durability
With over a decade of experience, Power Court has mastered the art of creating world-class sports flooring solutions that meet international standards.
Easy Application
With over a decade of experience, Power Court has mastered the art of creating world-class sports flooring solutions that meet international standards.
Consistent Quality
With over a decade of experience, Power Court has mastered the art of creating world-class sports flooring solutions that meet international standards.
Trusted Brand
With over a decade of experience, Power Court has mastered the art of creating world-class sports flooring solutions that meet international standards.
Weather Resistant
With over a decade of experience, Power Court has mastered the art of creating world-class sports flooring solutions that meet international standards.
Step-By-Step Process To Apply Cushion Coat
Surface Preparation
Ensure the surface has already been primed with Concrete Primer (for concrete base) and Acrylic Resurfacer.
Clean the surface to remove dust, dirt, and loose particles.
Repair cracks or uneven patches to maintain a smooth base.
- Mix Cushion Coat material with clean water in the recommended ratio provided by the manufacturer.
- Stir thoroughly to achieve a consistent mixture.
- Ensure rubber granules are evenly dispersed for a uniform cushioned effect.
Application Method
- Apply the Cushion Coat using a rubber squeegee for an even spread.
- Apply multiple layers (typically 2–3 coats) depending on the required cushioning level.
- Allow each coat to dry fully before applying the next layer.
Drying Time
- Each coat usually requires 3–4 hours to surface dry (depending on weather conditions).
- For best results, allow 6–8 hours of curing time before the next coat.
Next Step in System
Once Cushion Coat application is complete and fully cured, proceed with:
Color Coats for surface aesthetics and UV protection.
Line Marking for specific sports layout.
Applying Concrete Primer
FAQ's
A Cushion Coat is a specialized acrylic-based layer blended with rubber granules, designed to provide comfort, shock absorption, and player safety on sports courts.
It reduces impact on joints, enhances player comfort, and improves ball bounce consistency, making it essential for professional and recreational courts.
Typically, 2–3 layers are applied depending on the level of cushioning and the type of sport being played.
No. Cushion Coat should be applied only after the base has been primed and resurfaced with Acrylic Resurfacer.
Each coat generally takes 3–4 hours to surface dry and around 6–8 hours for curing, depending on weather conditions.
Explore More Products

Concrete Primer
Special coating to bond to concrete surfaces for maximum performance & durability.

Acrylic Resurfacer
High performance levelling compound to create smooth even surfaces for perfect installations.

Acrylic Colour
Acrylic paint specifically designed for sports court, vibrant long lasting color and superior UV protection.